A & B Report

A&B completely reopened !


First run of AB10 train on reopend main line in west garden renewed

**Go Back**
Track ground construction


Firming up the ground for setting the track in west garden forest


Curve track in north side of west garden forest and red marking for setting the ballast


Setting the ballast using crushed aggregate


Supervisor's morning business


On the board curing the brick worked, and on the path to west garden from the porch side


On the path in west garden before lawn laying


Timber trestles


Substructure of concrete for timber trestles and building wood structure


Fixing wood structure to base by L-type metal fittings and bolts


The longest beam over the stream (about 800mm span)


Lawn


Main line is almost completed in the west garden with a lawn and trees


West-garden station


Brick platform in the Westgarden station and its distance view from deck


The side view of Westgarden station with AB10 train


Main line reopened


AB10 train running on reopened main line through the forest


From the forest to the garage station, train crossing the tracks and brick path to the porch


Train passing the crossing and approaching to the garage station


Point and crossing


The track to the south garden from the west garden, and the close-up view of brick path crossing


Long-distance train


AB10 train running on the west garden line and on the timber trestles to the station


Running by cutting wall of the hill in the forest


Running on the stone pavement track in the south garden


Signal


Building the signal of 1/4 scale by using plywood


Testing the signal before painting in the garage station


Cleaning Goose


Goose with brooms turned out to clean the rail top of the track


Goose on the timber trestles with long coach


Low-angle photo of goose on the brick arch bridge


Deki-3 running


Deki-3 with wagon,short coach and van in the garage station


Deki-3 train running and stop the south garden of stone pavement


from south garden to the west garden, and on the brick arch bridge


Low-angle photo of Deki-3 train


Evening run


Supervisor Thoma on stone star in the lighting south garden, and AB10 turning on the head lights too at evening


Signal light turning from yellow to blue in the garage station for waiting Deki-3 train


Deki-3 train departured from the station, and through the front of the brick circle


It gets dark soon but the train running in the garden still.


Scenery


Green lawn, white path and red point lever, and the view of the porch side curve track


Green hill, white path and brown stairs, and the perspective view of the brick circle toward the south garden


Tourist in summer


The garden construction almost finished, and now A&B is full of joy and new hope.