A
&
B
Report
A&B completely reopened !

First run of AB10 train on reopend main line in west garden renewed
**Go Back**
Track ground construction

Firming up the ground for setting the track in west garden forest

Curve track in north side of west garden forest and red marking for setting the ballast

Setting the ballast using crushed aggregate
Supervisor's morning business

On the board curing the brick worked, and on the path to west garden from the porch side

On the path in west garden before lawn laying
Timber trestles

Substructure of concrete for timber trestles and building wood structure

Fixing wood structure to base by L-type metal fittings and bolts

The longest beam over the stream (about 800mm span)
Lawn

Main line is almost completed in the west garden with a lawn and trees
West-garden station

Brick platform in the Westgarden station and its distance view from deck

The side view of Westgarden station with AB10 train
Main line reopened

AB10 train running on reopened main line through the forest

From the forest to the garage station, train crossing the tracks and brick path to the porch

Train passing the crossing and approaching to the garage station
Point and crossing

The track to the south garden from the west garden, and the close-up view of brick path crossing
Long-distance train

AB10 train running on the west garden line and on the timber trestles to the station

Running by cutting wall of the hill in the forest

Running on the stone pavement track in the south garden
Signal

Building the signal of 1/4 scale by using plywood

Testing the signal before painting in the garage station
Cleaning Goose

Goose with brooms turned out to clean the rail top of the track

Goose on the timber trestles with long coach

Low-angle photo of goose on the brick arch bridge
Deki-3 running

Deki-3 with wagon,short coach and van in the garage station

Deki-3 train running and stop the south garden of stone pavement

from south garden to the west garden, and on the brick arch bridge

Low-angle photo of Deki-3 train
Evening run

Supervisor Thoma on stone star in the lighting south garden, and AB10 turning on the head lights too at evening

Signal light turning from yellow to blue in the garage station for waiting Deki-3 train

Deki-3 train departured from the station, and through the front of the brick circle

It gets dark soon but the train running in the garden still.
Scenery

Green lawn, white path and red point lever, and the view of the porch side curve track

Green hill, white path and brown stairs, and the perspective view of the brick circle toward the south garden
Tourist in summer

The garden construction almost finished, and now A&B is full of joy and new hope.
**Go Back**