A & B Report

Garden construction part 7


The view of west garden under construction from the first floor of garage

**Go Back**
Progress of garden construction


Supervisor Thoma in the porch looking in west garden direction


Many trees and grasses planted in south garden


The east side of south garden and back side of brick structure in west garden


Path in the garden


Morning observation of supervisor work and wooden form to making the path in the west garden


Supervisor Thoma looking and walking in construction site


White winding stream and wooden form for concrete casting to construct the path


Thoma patrolling on new soil and going to outside of garden with plastic bag in his mouth


Well and stream


A well constructed with brick and concrete as a source of the stream


The stream descending to the arch bridge and two white stones in it


Close-up of the stream in wash finishing and sidetrack toward the hill


Diesel loco of G gauge

@
Small diesel locomotive of G gauge constructing from the resin kit (using paper for original front grill)


Spraying surfacer after fixing of all parts




R=20cm curve in G gauge


Rail bended by holding in a vise and comparison between normal R=60cm curve and R=20cm one


Test run on R=20cm circle track by diesel loco and saddle tank


Smallest layout of G gauge


A Small layout (60 X 90 cm) with R=20cm curves, turnout and doubleslip under consideration


Sidetracks inside of endless are R=10cm and R=15cm


West garden construction


Another bridge construction site before the arch, and under-pavement for stone work of the path


The distance view of west garden under construction after concrete casting of the path


Report from the other


Photo sent from Hamada Factory's Premise Line of Kinuura Works, and the bogie part by this factory


The bogies assembled after a little handcraft, and loading a car body as a jest


Plasterer works finished


Close-up of the crossing on path, and the stepping stones from brick circle to the well


Low brick wall and posts along the curve of new line in the west garden forest


The plasterer work is finished that has been demanded about three months


Path to the hill


The path and the sidetrack reach the hill, and the dead end here ?


Stonework


Stonemasons started to their works on the path in west garden.


Stone work in the step path on slope ground and crossing of the stream


Automobile industry


Forklift truck of 1/6 scale radio controlled toy


New BMW Mini is 1/6 scale radio controlled toy too



Sapphire in the garage waiting for the service on new garden line of A&B

**Go Back**