A
&
B
Report
Garden construction part 6

AB10 train in the first run on south garden new track
**Go Back**
Arch Bridge

before and after of removing the semicircle forms

The view toward the west wood-deck

The distance view of brick structures in west garden
Brick road

Track through between six brick columns

Brick road foundation under construction and almost completed

The view in opposite direction
Cutting way

Cutting curve way in the forest with concrete wall

New brick structure starting construction in opposite of concrete wall
Planting trees
@
Center hole of brick circle and a tree planted there

Point lever removing to new green area in south garden under planting construction

Little new forest appearing in south garden
Equipments

LGB room light and LGB ropeway set
American narrow gauge loco

D&RGW K-28 #478 of On3 scale and it's cab
Reports from the others

Photographs from two garden railway owners of 3.5inches gauge, OS Kraus and 4 truck Shay under construction
Brick stairs

In brick structure constructed in west garden, and you can see new brick stairs over there

The front and side views of the brick stairs under construction
AB10 train on north deck

No.9 loco Plymouth and caboose in the east doorway of garage, and AB10 train running on the track in east corner of wood-deck

The check of clearance between rolling stock and structure in the west corner of deck

The end of track at present and the view of the west garden construction site from there
Useful garden railway

Radio flyer to carry baggages in the garden

Now garden railway can transport the heavy baggages from garden gate to house

AB10 freight train running from south garden to north deck

The train arrived Northern deck station in back of living room
Garden construction forever

Pitching a blue tent again on the brick structure and inside of there

The brick stairs completed and Supervisor Thoma under the arch bridge

Supervisor Thoma inspecting the brick structure with tent under construction
**Go Back**