A
&
B
Report
Garden construction

New DL Plymouth with tippers on sidetrack
**Go Back**
South garden construction

The construction starts in the front of garage (south garden).

Reinforcing steel mesh setting for concrete cast
West garden construction

Main line in the forest and crossing with new line to northern deck line

View of the garage station and yard
Stone pavement

Casting concrete and first line of paving stones

Cutting of sleeper's sides for stone pavement

Setting the track waiting for paving stone
Plymouth on Deck

No.9 loco Plymouth and crew on the sidetrack in west garden

Plymouth with tippers on northern deck line under cherry blossoms

Spring has come to A&B.
Track and stone

Adjustment of the track level in site of south garden construction

Before fixing of the tracks

Fixing of the tracks with mortar and stone

After setting of stones on one side of track
Point equipment

Manually operated point levers produced and set on turnouts in the station

View of the station lines and five light signal

Electric point machine setting on turnout of main line
Short Break

Very old live steam locomotive toy and 7-cylinder engine for model airplane

Free designed loco (HOe) on tram layout
Painting day

Painting sleepers of track with a brush and dry them in the west garden

Small tipper wagon painting yellow on the turnout
Maintenance and development

Battery maintenance of AB10 in the garage

Electronic experiment on future digital system for signal and other service
Track stone pavement

After setting stones of both sides of track in south garden construction site
**Go Back**