A
&
B
Report
Opening of A&B

AB10 train crosses the bridge in west garden
**Go Back**
Mowing

Grass clipper and track in the grass

Sidetracks to the shed and back of the shed
Curve to the forest and bridge in the garden
First train runs

AB10 with cars starts to service.

Into the east door to the garage

Through the garage

Going out west door from the garage to the west garden

Crossing the truss bridge
Movie of train from forest(440kb)
Movie of train through forest(592kb)
Movie of train through garage(960kb)
Movie of driving through forest(528kb)
Movie of driving through garage(1008kb)
Manufacturing turnout (Part 2)

Hinge of tongue rail and the edges of tongue rails

Welding works
Test run and close-up of frog
Painting rustproof grey
completion and comparison with one lever point

Close-up of tongue rails contact portion

Section of main rail(red) and tongue rail(blue and yellow)

Hinge of tongue rail and frog portion
Technical labo.

Underside of one lever point (looking to the pin support of lever)

OS trailer and circle track R=1m

Bogie and bolster

Supports of bolster(blue) and bogie(red)

Rotation of bogie to bolster in the case of curve tracks

The limit of curve radius is about 2m in this trailer
G gauge docksides

Decorder for switching the points and New dockside from bachmann

A dockside in this side is live steam by Wada Works.
Workdiesel

Workdiesel on turntable in the garage

Going to main line and out to the garden
Logging cars on deck

At east side of the garage, workdiesel and new logging car with short caboose

Coupler and running on the deck

Steel logging cars and orange caboose on corner of deck

Workdiesel side view and to the west deck with logging cars

Movie of logging cars (464kb)

**Go Back**