A
&
B
Report
Garden construction part 2
Double-decker tram on new line of flagstones way under construction
**Go Back**
Construction in south garden
Paving stones in the south garden
Track in the pavement stones and supervisor Thoma looking the construction site
He walks on hardened concrete and pavement stones to confirm the
construction quality.
Station
Five light signal with electric distribution and yellow concrete block (real part)
Thoma in the porch by the station and the distant view from west garden
Workshop
Workshop in front of the garden and toolbox car in the track construction site
Linking of track
New line constructed in the forest (left one and back one)
New line constructed in the west garden corner and edge
New line linking to the track on wooddeck
Running in construction site
No.9 loco Plymouth with tippers on the new track in south garden
Galliver Line
Beautiful photo from Galliver Line and Presidents of Galliver Line and Bentengaoka Line
Investigation
Texts for establishing the control system of signal or crossing alarm
Yard in the garage
Modification of the track layout in the garage
New wheels and supervisor Thoma in the garage
Goose with brooms
Goose equipped with two brooms for cleaning rail top
Brooms support setting on front chassis directly
Signal setting
Bracket set on post of station and three light signal setting up
Complete stone pavement
Thoma looking the complete stone pavement in south garden and close-up of track (finish between rails)
New red mortar mixer and next construction site of brick wall
Plymouth running on new line in south garden toward east garage line
**Go Back**