A & B Report

Start of construction

**Go Back**
Track construction

April 2001
Placing the system tracks
May 2001
Little progress
June 2001
A little progress
July 2001
Ballast works
Elevated track on concrete blocks
Set. 2001
Construction stops in summer.
The weeds are dense in the garden.
Oct. 2001
He is a construction overseer.

Locomotive

Oct. 2001
Workdiesel and driving trailer on first short endless
    First run on large endless by Modelnics product at Oct. 2001





Locomotive "AB10"


Manufacturing the body of AB10 with paper


Pantograph is made of brass (paper at first in right picture)


Painting of surfacer gray and trial run


Body color is pink and roof is silver.


AB10 in the autumn garden


Truss bridge


Self designed and built steel structure before painting red


Caboose


Manufacturing of caboose in Dec. 2001
Wood chassis and paper body


Painting red and lettering
Caboose is most favorite rollingstocks.